Click the donate button to pay R100 to this site. There are over 50 free Lesotho GPX files
172 km 4 Hrs 10 min
The low level bridge in the picture above can flood after heavy rains making this route unpassable. Only attempt this route in dry conditions - can be dangerous in snow and heavy rain